Baseline the system
Map ticket to production. Capture flow, review load, quality, and AI spend before any uplift claim.
_>APPTENSION SDLC · AGENTIC SDLC
The Agentic SDLC framework is how we get more accepted production work from the same team without more defects, more risk or longer senior review queues. Two projects run on it: nini.bot (new product) and Teamdeck (legacy modernization).
2 weeks
IMPLEMENTATION
6 months
MANAGED ADOPTION
100%
CLIENT-OWNED HARNESS
_> Individual speed is easy to see. Team delivery, review capacity and return on spend are not. These are the four gaps we see most often.
01
AI moves the constraint from writing code to reviewing it. More output without more review capacity just builds a queue.
02
Developers feel faster. Few companies can connect AI spend to delivery or business numbers without a process around the tools.
03
Generated diffs often look right and still need careful review. Smaller pull requests, repository context and automated pre-checks reduce that cost.
04
Teams adopt agents faster than they add policies, CI gates and traceability. In production, every change should trace back to its ticket, the checks it passed and the person who approved it.
How it runs
SCATTERWe measure your baseline first. The harness goes into one repo in two weeks. Six months of managed adoption show whether the economics hold.
Step 1 of 3
Map ticket to production. Capture flow, review load, quality, and AI spend before any uplift claim.
Shared context, skills, verification, PR evidence, and autonomy boundaries on a real repository.
Six months of monthly cycles: coach the team, fix what breaks, extend what works and report cost per verified change.
_> More verified production work from the same team. People keep the final say on architecture, security and releases.
01
We baseline flow and quality first, then report review wait and cost per verified change next to any throughput number.
02
Repeatable senior knowledge goes into context files, checks and gates, so routine work needs less of your strongest engineers' time.
03
Shared skills, rules, telemetry and cost data live in your repository. Models change; the process stays.
_> The question we answer: does the same team deliver more accepted production work per dollar, without more defects, risk or senior supervision?
Find where review wait, defect risk and AI spend sit today, so any later ROI claim has a baseline behind it.
In two weeks, one real team and repository get a working harness your engineers own.
Run the live backlog through shared skills and verification, so seniors stop repeating the same standards in every pull request.
Count accepted production changes and cost per verified change. Tokens, commits and generated lines don't count.
Turn each failure into a rule, skill or test, so the same mistake doesn't cost senior time twice.
Roll out only the workflows that have already shown value.
→ Swipe through the process
START HERE
Take the two-minute maturity diagnostic, then see how each scorecard metric is measured before and after an engagement.
BUILT WITH APPTENSION SDLC
_> A production infant-care PWA we built on the same harness we install for client teams.
0
Merged PRs in 11 days
0
Closed issues shipped
0+
Cited knowledge articles
GITHUB PROOF · JUL 31 – AUG 11, 2026

Installable PWA shell with care logging and bottom navigation

QUICK LOG
One-tap timers with recent stats

KNOWLEDGE
Cited, swipeable guidance cards

VISUAL LANGUAGE
In-app illustration system for every screen and guidance card
Delivery outcomes
01
41 PRs merged on day one, 50 on Aug 1, 2026. Every agent branch passed Vitest, review and repository rules before merging.
02
Rhythm orbit wheel, offline outbox sync, OTP auth, Neon Postgres, PWA install shell, and CMS-seeded knowledge library in one continuous delivery run.
03
Installable at nini.bot today. The delivery loop, context packs and verification gates behind it are what we set up for client engineering teams.
SECOND PROOF · PLATFORM MODERNIZATION
_> Staging now runs on Temporal, Pulumi and ECS, and product work never paused. Production cutover is still ahead. What we can show today is the process and its gates.
0
PRs in ~5.5 weeks of GitHub history
0h
Median PR open → merge
~0k
Lines of plans, specs, ADRs, runbooks

Bindings table, docs map, and path-scoped rules so agents and humans share one source of truth for branch, CI, and verification.
Twelve workflows and thirteen tested gate scripts. Release-line merges, promotion ancestry, drift detection, and first-pass review on every PR.
Stage is live end to end. Prod cutover is planned, not done. Cost parity waits for measured post-cutover numbers.
_> Process, measurement and ROI for anyone evaluating the approach. Playbook, maturity diagnostic and scorecard for sponsors and platform leads.
NEXT STEP
A first call with your engineering sponsor covers goals, constraints, risk appetite and which repository to pilot in. The two-week implementation is the place to start.
New · AI-native delivery
Ship a production MVP in weeks, or install agents into the team you already have.
HQ in Poznań, Poland